Shanghai Federal Mogul Bearing Co. (part of the Tenneco group) has commissioned its compressed air station as the group's first Grade-1 energy-efficiency station in Asia-Pacific built on an energy performance contract (EMC). The interesting part is not the equipment list — it is who carries the capital and the risk.
What the contract model solves
Plants often stall at the budget stage: the investment is large, the payback takes two to three years, and finance will not approve. An energy performance contract moves the equipment cost to the service provider; the customer pays from the savings or a contract air price, with little or no upfront capital.
Federal Mogul is a core component supplier within the SAIC system and a long-standing tier-one supplier to major OEMs. It cannot afford to stop production, which is exactly why the EMC route fits: no capital outlay, no stop-line risk.
What Grade-1 certification requires
| Item | Requirement | Where plants fail |
|---|
| Metering | Station meter plus sub-meters per unit | Only a total meter, no split |
| Pressure | Stable, not inflated | Habitually set above 0.75 MPa (gauge) |
| Dew point | Matched to process | Running at the driest setting all year |
| Leakage | Kept low and monitored | Old piping, many joints, no survey |
Certification is not bought with high-efficiency hardware. Metering and operating discipline carry more weight than most owners expect.
Three clauses the customer should watch
First, the baseline. Is saving measured against a three-year average or the last year before retrofit? A different basis can shift the shared amount by hundreds of thousands of yuan.
Second, operating responsibility. The equipment belongs to the provider, but the daily set-point sits with the customer. If pressure is raised to protect supply, who owns the lost saving? Specify the allowed pressure band and change procedure.
Third, exit terms. Over a ten-year term a plant may expand, relocate or change product mix. Agree upfront how demand changes are handled.
Local execution
Air stations cannot wait. Our Minhang team handles station assessment, design, supply and maintenance, with pressure controllers and air receivers stocked locally so a retrofit does not stall on lead time. For any plant considering EMC, collect at least seven days of data and fix the baseline before negotiating the split.
Ingersoll Rand Shanghai Sales & Service Center
Tel: +86-21-3466 5187 / +86-139 1754 6064
Address: No. 5600 Huming Road, Minhang District, Shanghai
我公司承若7X24小时为您提供服务,我们再全国范围内拥有完整强大的服务网络,和专业培训的技术人员和工程师。只要您的一个电话,我们随时可以为您提供具有创造力的,高效率的服务解决方案,是您的空压机系统时刻保持最佳状态!
英格索兰空压机(中国)销售服务中心
整机销售 : 13917546064 15900576841 13391146077
零件销售 : 18721376781 021 - 34665187
售后服务:18721376780
服务电话 : 021 - 34665187