Shanghai Federal Mogul Bearing Co. (part of the Tenneco group) has commissioned its compressed air station as the group's first Grade-1 energy-efficiency station in Asia-Pacific built on an energy performance contract (EMC). The interesting part is not the equipment list — it is who carries the capital and the risk.

What the contract model solves

Plants often stall at the budget stage: the investment is large, the payback takes two to three years, and finance will not approve. An energy performance contract moves the equipment cost to the service provider; the customer pays from the savings or a contract air price, with little or no upfront capital.

Federal Mogul is a core component supplier within the SAIC system and a long-standing tier-one supplier to major OEMs. It cannot afford to stop production, which is exactly why the EMC route fits: no capital outlay, no stop-line risk.

What Grade-1 certification requires

ItemRequirementWhere plants fail
MeteringStation meter plus sub-meters per unitOnly a total meter, no split
PressureStable, not inflatedHabitually set above 0.75 MPa (gauge)
Dew pointMatched to processRunning at the driest setting all year
LeakageKept low and monitoredOld piping, many joints, no survey

Certification is not bought with high-efficiency hardware. Metering and operating discipline carry more weight than most owners expect.

Three clauses the customer should watch

First, the baseline. Is saving measured against a three-year average or the last year before retrofit? A different basis can shift the shared amount by hundreds of thousands of yuan.

Second, operating responsibility. The equipment belongs to the provider, but the daily set-point sits with the customer. If pressure is raised to protect supply, who owns the lost saving? Specify the allowed pressure band and change procedure.

Third, exit terms. Over a ten-year term a plant may expand, relocate or change product mix. Agree upfront how demand changes are handled.

Local execution

Air stations cannot wait. Our Minhang team handles station assessment, design, supply and maintenance, with pressure controllers and air receivers stocked locally so a retrofit does not stall on lead time. For any plant considering EMC, collect at least seven days of data and fix the baseline before negotiating the split.

Ingersoll Rand Shanghai Sales & Service Center

Tel: +86-21-3466 5187 / +86-139 1754 6064

Address: No. 5600 Huming Road, Minhang District, Shanghai

我公司承若7X24小时为您提供服务,我们再全国范围内拥有完整强大的服务网络,和专业培训的技术人员和工程师。只要您的一个电话,我们随时可以为您提供具有创造力的,高效率的服务解决方案,是您的空压机系统时刻保持最佳状态!

英格索兰空压机(中国)销售服务中心

整机销售 :  13917546064   15900576841  13391146077

零件销售 :  18721376781   021 - 34665187

售后服务:18721376780

服务电话 :  021 - 34665187